    Carbon Reduction Commitments and Policies

     

    AUO began auditing the GHG emissions of our global manufacturing sites in 2003, and the ISO14064 standard was introduced to disclose emissions-related information through external verification. We developed a digital platform internally in 2010 to systematically manage the organization‘s GHG emissions as a means to managing long-term operational carbon reductions.

    Innovative Low-carbon Production
     
    • Progressive reduction of F-Gas
    • F-GHG volume reduction
    • Ecological benefits indicator management
     

    Achievement

    • All factories have installed L / S.
    • Reduce the emission of high GWP fluorinated greenhouse gases (F-GHG) with an efficacy of more than 99%.
    Greater Energy Efficiency
     
     
    • Energy conservation efficacy verification
    • Smart energy monitoring and control
     
     

    Achievement

    • More than 1200 energy management proposals in 2024.
    • The annual electricity saving rate is 4.72%.
    Promote Renewable Energy
     
     
    • Power from renewable energy
    • Green certifications
     
     

    Achievement

    • Taiwan's self-use renewable energy in 2024: 139.76 MWh
    • Taiwan's CPPA green energy supply in 2024: 100,907 MWh
    • China's self-use renewable energy in 2024: 62,526.59 MWh
    • China's CPPA green energy supply in 2024: 97,908.35 MWh
    • China's G-REC purchase in 2024: 30,000 MWh

    Innovative Low-carbon Production


    Greater Energy Efficiency


    Promote Renewable Energy


    Energy-saving training

     

    Energy efficiency training provided to employees to raise awareness of energy consumption reduction.


    Innovative Low-carbon Production

    Scope 1 and 2 targets of AUO follow the SBT 1.5°C warming scenario, with an absolute reduction of 42% in carbon emissions by 2030, using 2021 as the base year. In this pathway, the targets for Scope 1 in 2024 are set at 69,200 tons of carbon equivalent, while for Scope 2, it is 2,493,300 tons of carbon equivalent.

     

    Unit:tonnes CO2e

     

    Achievement

     
    Full implementation of F-GHG management (scope1)

    Reduction of fluorine-based gas emissions(F-GHG), with high greenhouse gas emission potential in the process, reaching destruction removal efficiency over 99%

    2020
    • Improve the performance of L/S
    • Assist customers to meet the highest standards of EPEAT
    • Applying artificial intelligence (AI) to improve the usage of F-Gas
    2014
    • All factories have installed L / S
    • The installation rate is 100%
    2010

    Voluntary commitment to install destruction removal facility: Local Scrubber (L / S) for all existing fabs.

    2004

    Signed a memorandum with the Environmental Protection Agency to reduce F-GHG emissions by installing destruction removal facility: Local Scrubber (L / S) for new fabs.

    Accumulated reductions and Emissions per unit area in PFCs
     

    Greater Energy Efficiency

     

    Energy use and power saving goals

    Unit:100 million degrees

     

    Achievement

     
    Continuous improvement of energy management (Scope2)

    More than 1,000 energy management programs every year, exceeding the target annual energy-saving rate 1.5%.

    2023

    The “Energy Saving Strike Force” was set up and the “3030 Project” launched at AUO’s manufacturing operations unit. A phased target of reducing energy consumption by 30% by 2030 was set.

    2018

    Introduced IPMVP audit system

    2017

    Applied internal carbon prices to improvement proposals

    2016

    Developed the wireless electronic meter and approval process for EnMS, increasing the data accuracy

    2015

    Annual electricity saving rate over 1.5% and hold the Energy-saving performance award competition

    2014

    Ensured measurement and verification of energy-saving solutions in EnMS informatio platform

    2013

    ISO 50001 global verification and renewal.

     
    • Integrated Green Production (GP) into ISO 50001 management system operation
    • Developed of Energy Management System plattorm (EnMS)
    • Built the energy and design specifications of machine procurement.
    2012

    Introduced ISO 50001 verification in all factories

    2011

    Received the world's first ISO Manufacturing 50001 certificate in

    2010

    Introduced ISO / DIS 50001 demonstration

    AUO energy-saving effectiveness over the years

    The power saving plans including actual investment and management actions contributed power saving rate over 1.5%.


    Promote Renewable Energy

     
    • Power from renewable energy
    • Green certifications
     
    Rooftop Solar Power Plants in Taiwan factories
     
    • The installations of the solar power plants in all sites in Taiwan achieved a total installed capacity of nearly 42 MW.
    • The first TFT-LCD manufacturing company in Taiwan to obtain renewable energy certificates.
     

    Total installation

    42    MW

     

    Area

    18.5    hectares

    (25.8 football fields)

     

    Power generation

    146650    kWh / day

     

    Electricity supply

    14665    households / day

     

    GHG Reduction

    28248    tones CO2e / Year

    (72.6 CO2 absorption of Daan Forest Park in one year)

    Energy-saving training

     

    AUO plans basic energy-saving education and training, starting from understanding the distance between us and net-zero, allowing colleagues in production and manufacturing units to clearly understand net-zero carbon emissions and energy conservation sustainability. For colleagues in manufacturing units, AUO offers two types and more than 10 courses of energy-saving: basic and advanced applications. These courses cover topics such as clean room space structure and equipment operation principles, methods of electricity conservation, measurement and verification of energy-saving benefits, as well as the energy-saving principles and case studies of high-energy-consuming equipment (such as heaters and pumps), combining practical on-site practices to enhance energy-saving effectiveness. In 2023, the number of trainees exceeded 4,000 person-times.

     

    AUO also promotes energy consumption reduction awareness through email or posters, encouraging practical energy efficiency behaviors. For example, promoting "Cool Business for Summer" encourages colleagues to choose lightweight, appropriate, and comfortable business attire to achieve energy consumption reduction by setting the office temperature appropriately and reducing air conditioning usage. Additionally, there are office energy consumption reduction tips, such as using stairs instead of elevators, setting computers to power-saving mode, and turning off power when leaving the office. AUO also organizes events such as "Green Knowledge+ Green Citizen Action" and "Energy-saving School" to invite employees to record and share their personal energy consumption reduction actions, thus strengthening and spreading energy consumption reduction awareness in their work and daily lives.

    Scope 3 GHG emission

     

    Greenhouse Gas Management Milestone

    2020 Introduce ISO 14064-2018 and receive the certification, making AUO the first company in the display panel industry
     
    Scope 3
    2023
    New inventory item

    Downstream leasing and capital goods (11 items in total)

    2021
    New inventory item

    Upstream leased assets (9 items in total)

    2019
    Develop systematic management of Value Chain Accounting (VCA) platform
    2016~2018
    New inventory item

    raw materials of upstream and downstream transportation and purchase ( Total of 8 items )

    2012~2015
    New inventory item

    waste, employee commuting, subsidiaries, fuel energy (Total of 5 items)

    2010
    Start the Scope 3 carbon inventory of the value chain

    employee business Travel (Total of 1 item)

     
    Scope 1&2
    2012~Present
    Participate in the promotion of all greenhouse gas projects of the Environmental Protection Administration

    previous project verification, development of offset methodologies, and declaration operation of the Greenhouse Gas Reduction and Management Act

    2020
    Verified through the methodology of carbon emission rights substitution by the EPA
    2010~2011
    Organize audit and verification demonstration programs
    Expand supplier audit scope
    ECA platform systematic management
    2007~2009
    >Respond to CDP' s disclosure of the carbon management mechanism
    Counsel the supply chain to introduce greenhouse gas inventory
    2005~2006
    Introduce ISO 14064-1 third party verification in 2005-2006, and obtaine declaration for all factory areas
    2003
    First year of greenhouse gas inventory

    Historical GHG Emission